Project Location: | Various streets throughout Hanover Park and the north commuter parking lot
|
Phase: | Construction |
Project Status | Bids Received |
Construction Start Date | 2023 |
Construction Completion Date: | TBD |
Contractor: | Denler, Inc. |
Construction Engineer: | In-House |
Design Engineer: | In-House |
Awarded Construction Amount: | $90,000.00 |
Adjusted Final Construction Amount : | TBD |
Funding Source(s): | Local |
OBJECTIVE:
To slow down the deterioration of the Village's asphalt pavements.
DESCRIPTION:
This project includes crack sealing of various streets throughout the Village as well as crack sealing, sealcoating, and striping of the north commuter parking lot. The use of a crack seal agent prevents moisture, dirt, and debris from entering the pavement at locations where it was not intended, slowing down the pavement at locations where it was not intended, slowing down the pavement deterioration. Installation of a sealcoat helps reduce raveling (loss of aggregate) on the surface of the asphalt pavement.