Project Location: | Various locations throughout Hanover Park |
Phase: | Construction |
Project Status | Bids Received |
Bid Opening Date: | April 6, 2023 at 11:00 AM |
Mandatory Pre Bid Meeting: | No |
Construction Start Date: | 2023 |
Construction Completion Date: | TBD |
Contractor: | Globe Construction, Inc. |
Construction Engineer: | In-House |
Design Engineer: | In-House |
Awarded Construction Amount: | $200,000.00 |
Adjusted Final Construction Amount: | TBD |
Funding Source(s): | Local |
OBJECTIVE:
Repair damaged or deteriorated sidewalk or curb & gutter throughout the Village.
DESCRIPTION:
This project consists of the repair of the sidewalk or curb & gutter that was damaged due to a watermain break or that has deteriorated due to the elements.