Create a Website Account - Manage notification subscriptions, save form progress and more.
| Project Location: | Springinsguth Stream (West Branch DuPage River) Hanover Park: Northway Dr west to where the stream enters a pipe Schaumuburg: Springinsguth Rd to east of Northway Dr. |
| Phase: | Construction |
| Project Status: | Construction |
| Bid Opening Date: | April 27, 2023 at 11:00 am |
| Mandatory Pre Bid Meeting: | April 11, 2023 at 11:00 am |
| Construction Start Date: | September 5, 2023 |
| Construction Completion Date: | |
| Contractor: | EarthWerks Land Improvement & Development Corporation |
| Construction Engineer: | Engineering Resource Associates |
| Design Engineer: | Hanover Park: Engineering Resource Associates Schaumburg: WBK Engineering |
| Awarded Construction Amount: | $6,500,000.00 |
| Adjusted Final Construction Amount: | |
| Funding Source(s) | EIEPA GIGO, MWRD Green Infrastructure, Local, Village of Schaumburg |
OBJECTIVE: Provide improved stormwater quality by providing improved streambank stabilization and reduce flooding with the creation of new flood plain storage areas.
DESCRIPTION:
Hanover Park: The project restores and stabilizes the eroded streambanks. Work includes streambank excavation and re-shaping, removal of a box culvert, and re-meandering of the stream to create new channel and forebay areas. Rock toe, in-stream rock substrate areas, stream barbs, and pre-cast modular retaining walls are used as stabilization measures. New native plantings will be installed to improve water quality.
Schaumburg: The project includes realignment of portions of the channel to create a sinuous reach, regrading of banks, installation of vegetated stone toe, installation of two riffle structures, removal of existing sheetpile wall, installation of a new watermain under the stream, lining of a sanitary sewer under the stream, grading to create floodplain storage, and plantings/restoration.